The Problem & Initial Inspection Findings
An outdated 1920s 3-bedroom residence required full electrical, plumbing, and structural layout modernization while strictly complying with rigorous building board alteration rules.
Comprehensive Scope of Work
Phased Construction Methodology
1Phase 1: Board Review & DOB Filing
Submitted architectural drawings, structural engineering affidavits, and work schedule to the Co-op board and NYC DOB.
2Phase 2: Soundproof Demolition
Removed partitions and outdated plumbing using acoustic dampening protocols within allowable building work hours.
3Phase 3: MEP Rough-Ins & Waterproofing
Ran all new electrical, plumbing, and HVAC ducting. Floated floors with acoustic underlayment and installed Schluter waterproofing membranes.
4Phase 4: Artisan Millwork & Finish Detailing
Installed custom millwork, marble book-matched slabs, architectural trim, and zero-VOC paint finishes.
Engineering Challenges
Strict Co-op board operating restrictions including rigid 9:00 AM – 4:30 PM working windows, elevator reservation limitations, and stringent building acoustic transmission thresholds.
Final Verified Result
Project delivered on schedule within 14 weeks with zero noise violations, full building sign-off, and exceptional luxury appraisal appreciation.